Home page |  Site map  |  Download  |  Print          
Javascript DHTML Drop Down Menu Powered by dhtml-menu-builder.com

New treated water connection
DVIZ is equipped with a treated water supply system distributing water to the clients via an underground network of HDPE pipes. This system is connected to the city network with capacity of 12,500 m3/day.
 

Raw water
A reliable source of surface water from Da Do River will be provided to DVIZ to meet with raw water demand to the clients in DVIZ. The Feasibility Study is being prepared by Hai Phong Department of Transportation.


 Water Treatment Plant
Independent water treatment and water storage capacity built up on site.
 

Clean water CONNECTED WITH THE CITY WATER SOURCE WITH CAPACITY OF 12,500m3/day
FUTURE CAPACITY : 40,000 m3/day
Raw water TO BE SUPPLIED FROM DADO RIVER SOURCE WITH CAPACITY OF 40,000 M3/DAY

 


About us | Why Dinh Vu | Master Plan | Clients | News & Events | Links | Contact
Copyright © 2009 Dinh Vu Industrial Zone JSC